Google
Sunbury Heights was employed for the role of PM and Cost Controllers for the new Google offices in
St.Petersburg. Total occupied area is 1518m2 located on top floors of Alia Tempora Business Center,
straight off Nevsky prospect with spectacular views over historical center of the city.
We were happy to be involved in creating a real “Googly” atmosphere which means that the work space is both fun and practical and also very unique. Like in Google offices all over the world it allows individuals to configure and reconfigure their space to suit their work style, their team requirements, their creative whims, or combination of all three.
Creating a healthy environment was also a must which resulted in a lot of natural light, open, industrial-look ceiling to visually increase its height and the ability to control the lighting, temperature, and the arrangement of the offices as much as possible.
Amway London
Amway (UK) appointed Sunbury Heights as their Project Manager's for their new London retail
and product training center. As a major new venture for Amway they have decided to open their
first retail outlet in the centre of London. The centre which will be the first of its kind in
the world comprises retail space on the ground floor and training and conference facilities for
Amway's business partners on the first floor.
This project was particularly demanding as the client was unavailable to attend site on a regular basis and they relied heavily upon the advice and judgedment of Sunbury Heights in making critical decisions in relation to the project as it progressed. We are pleased to say that they are very happy with the completed project and are confident given the positive reaction that has already been received that the investment will create considerable value for their business
Goldman Sachs
Appointed as project and cost managers by this leading investment bank,
Sunbury Heights led the procurement, design, construction and close-out process
to a successful conclusion. Situation over two floors of Ducat 3 business centre
in central Moscow, the Goldman Sachs projects was both demanding and complex in terms
of both architectural finishes and critical systems.
TSYS
A fast-track project for this global supplier of credit card processing
equipment and services meant that Sunbury Heights was tasked with moving swiftly
ahead with a design and build appointment and push them to complete in the quickest
possible time. Challenged by an idiosyncratic landlord and reporting to the London
TSYS headquarters, Sunbury Heights finished the project successfully, meeting the client's
timescale requirements, which achieving a high degree of cost control and
delivering a great quality office.
Trust Bank
Sunbury Heights was appointed Construction and Cost Manager for the headquarters
and satellite office projects of this major Russian bank. We reported to senior management
and were able both to save considerable amounts of money from the construction contract and ensure
the project was delivered at a higher than expected quality.
Bayer
As construction and cost managers of the new head office of Bayer in Moscow Sunbury
Heights worked with an already appointed general contractor and managed to reduce the
total contract amount by over 16% without affecting the quality of the finished works.
Our work with Bayer meant that we have been appointed project managers for all the major
pharmaceutical groups in Russia.
McKinsey
International management consultant McKinsey employed Sunbury Heights for their new Moscow HQ
project. This prestigious 8500m2 project provided excellent opportunity for Sunbury Heights professionals
to demonstrate their project expertise and attention to details.
Baker & McKenzie
US Law firm Baker&McKenzie major expansion of their HQ in Moscow.
This 4000 m2 project involved the demolition, redesign and reconstruction of elements of their existing
building while work went on around.
Pfizer
Pharmaceutical giant Pfizer planned a major refurbishment of their Russian head
office and employed Sunbury Heights to plan the work, enabling their operations onsite to continue uninterrupted.
JPMorganChase
JPMorganChase employed Sunbury Heights to project and cost manage
their major expansion in Moscow. This 4500 m2 project was demanding in terms of both
quality of finish and critical engineering and IT systems. The JPMorganChase engagement meant that
Sunbury Heights has now managed HQ projects for really all the global investment and retail banks,
including Goldman Sachs, Sumitomo Mitsui Banking Corporation, Bank of Tokyo-Mitsubishi, , BNP Paribas/Cetelem,
Texas Pacific Croup and now JPMorganChase.
TNK-Stolitsa
Followed by previous experience on another project with the Client, Sunbury Heights was employed to manage the relocation of 3 new devisions of TNK-BP into new "Pallau-SW" B+ Business Center in the south west of Moscow. The scope included tenders for General Contractor for Design&Build, Furniture supplier and Moving Company.
Moscow City Transportation Terminal
Estimation and cost control services for the biggest infrastructure project in Moscow in 2007 - the $200m transportation terminal situated in the centre of the huge Moscow City development. A critical hub for all the City development, the transportation terminal project includes an underground railway terminal, a regional rail terminal, a hotel and an office building.
PriceWaterhouseCoopers Kiev
Overall project and cost management for this large accounting firm’s new 2800m2 Kiev headquarters. With a challenging timescale and strict cost targets, we were able to deliver this challenging project despite a lack of world class contractors in this location. Our trademark project extranet enabled key members of the PWC team overseas to maintain oversight of the project remotely.
Renaissance Capital Moscow
Overall project and cost management for this fast-growing Russian investment bank. With over $15 billion of M&A activity in 2005, this aggressive investment and financial services group had demanding objectives for its new Moscow City 15000m2 high-rise headquarters in Moscow City.
Renaissance Capital Almaty
Overall project and cost management for the Kazakh HQ of this fast-growing Russian investment bank. Leveraging our experience in managing the global headquarters of the Renaissance group we were able to ensure that corporate standards and targets in relation to quality, cost and timescale were met.
Sun Microsystems Moscow
The growth of this US software group meant that they needed to take extra space in their existing Moscow building. However, the demanding requirements of Sun for security and IT meant that Sunbury Heights professionals were employed to manage the whole process and coordinate all works, including managing overall costs. Liaising between the local business and the international real estate and facilities managers of Sun was a challenge but one on which the team excelled.
Schering Plough Kiev
The 600m2 Kiev HQ of this pharmaceutical group was a challenging project, with a landlord who insisted on using his own contractor for all construction works. Controlling this contractor, given his lack of international corporate experience and poor record was a real challenge, and required the dedication of our Kiev PM team to ensure that the client’s challenging targets were met. Nonetheless, we were proud to build on our experience of managing the construction of Schering Plough offices elsewhere to deliver the project successfully.
Cetelem & BNP Paribas
The project for Cetelem & BNP Paribas consists of a design and build fit out project for tw2 floors, or in total 4000sq metres at Severnoye Siyanie, Ulitsa Pradvy 26. The requirements are for back office and administration bank offices of Class A quality. The project timeline and delivery of completed space are critical to the client, due to an overburden of personnel on their current space, and a major drive for expansion. Cetelem and BNP Paribas are two divisions of the same parent company, BNP Paribas, one of the largest banking industry groups, with headquarters in Paris, France.
Bank of Cyprus
1500 sq.m. Business Center "Olympic Plaza - l", 8, 9 floors, Expansion of one of the largest Cypriot banks Overall PM - Tender and Appointment of Architects, M&E Consultants, GC, cash/b-room specialists, inspection of building structural elements and reinforcement design.
ABB Moscow
New H.Q. building of approximately 4700sqm on 2 floors.
Tender and appointment of Design and Build contractor.
Overall PM and cost control from shell-and-core into "Krugozor" building on Obrucheva st. in Southern Moscow.
Toyota Financial Services
900 sq.m
New Central Moscow headquarter of Toyota bank.
Overall PM from shell-and-core including Due Diligence, Tender and Appointment of Architects, M&E Consultants, GC, cash/b-rooms specialists, inspection of building structural elements, preparation of technical statement and reinforcement design.
Amway
2600 sq.m.
Further expansion of one of the world’s largest and most successful direct selling companies. PM from shell-and-core including lease negotiations and due diligence.
Bank of China
1000 sq.m
Expansion of one of the largest Chinese banks Into new HQ Due Diligence and PM from shell-and-core, incl. Tender and Appointment of structural engineers and cash/b room contractors.
Novartis Pharma
Sunbury Heights were appointed to manage the design and construction of the new Moscow headquarters of Novartis Pharma (adding to our portfolio of pharmaceutical clients which already includes GlaxoSmithKline, Merck, Schering, Schering Plough and IVAX). Responsible also for full cost control on the project, Sunbury Heights was chosen for this 2800m2 project against stiff international competition.
Prof-Media
New Moscow HQ, 15500m2.
Tender and Appointment of Architects, M&E Consultants and GC
Overall PM from Shell and Core
5-floor building in central Moscow, incorporating offices, radio stations and executive areas for this media conglomerate
Schlumberger
New Moscow HQ, 7500m2.
Tender and Appointment of Architects, M&E Consultants and GC
Overall PM from Shell and Core
7-floor building in central Moscow, incorporating offices, technical rooms and client areas
2X2 TV Channel
Sunbury Heights were appointed PMs and cost consultants for the expansion in Moscow of this major Russian TV station.
Impressed by previous Sunbury Heights projects for media companies Bloomberg, Prof-Media and Eurovision, 2X2 requested
Sunbury Heights management of all work, including initial technical requirements appraisal and building due diligence.
Further to this work, Sunbury Heights is organizing all design and construction tenders, as well as managing construction
work and cost claims to meet the exacting requirements of this leading media organization.
Bank of Tokyo-Mitsubishi
New Central Moscow headquarters of large Japanese bank.
Due Diligence, Tender and Appointment of Architects, M&E Consultants and GC
Overall PM from Shell and Core
at centrally located Class A building.
GlaxoSmithKline
New office representing the consolidation and relocation of 2 key operating divisions of this pharmaceutical corporation.
Tender and Appointment of Architects, M&E Consultants and GC
Overall PM from Shell and Core
at Krylatsky Hills Business Park, 2500 m2
RTS
Sunbury Heights was employed to manage the full redesign of their existing VIP area.
Tender and Appointment of Architects, M&E Consultants and GC
Overall PM from Shell and Core
Sunbury Heights also was responsible for approvals.
Svenska Handelsbanken
New Central Moscow HQ, 1500 m2.
Tender and Appointment of Architects, M&E Consultants and GC
Overall PM from Shell and Core
Major expansion of Swedish bank into the Russian retail banking market
Eurovision
Leading European TV distribution company Eurovision moved their operations from the Rossiya Hotel after it was closed for redevelopment.
Sunbury Heights was employed as overall PM to help them do this; involving the evaluation of office space, appointment of an architect, M&E Consultant and General Contractor. Despite a challenging technical brief, Sunbury Heights led the appointed team to a superlative result and one in which the client is very satisfied.
Huawei Technologies
Major expansion of Chinese technology company into 3 floors at Class A Business Park.
Tender and Appointment of Architects, Furniture supplier and GC
Overall PM from Shell and Core
at Krylatsky Hills Business Park, 4500 m2
Linklaters Partnership
New Central Moscow HQ, 1800 m2.
Due Diligence, Landlord fit-out, Tender and Appointment of Designers and Specialist Subcontractors
Overall PM from Shell and Core
High value installation in Enka building
Sabre Holdings
Full PM and cost consultancy service.
The project included demolition of existing interior and full, high quality re-fit of new office space in the centre of Moscow for this international travel group.
Mees Pierson Intertrust
Project management and cost control for a quality fit-out of the new central Moscow offices of this private bank across from the Kremlin.
GlaxoSmithKline Kiev
Relocation of GSK DMEA (Ukraine, Central Asia, Caucasus) Headquarters to FIM Business Centre, 1300m2.
Management of Architectural and Engineering Design, Budget Development and Management, Appointment of Contractors, Cash Flow Projections, Master Scheduling, Contract Administration and Management, Field Supervision, Coordination of Required Inspections and Testing.
Schering Plough
New Moscow HQ, 1300m2.
Due to rapid growth Schering Plough have been decided to expand to larger office.
Tender and Appointment of Architects, M&E Consultants and GC
Overall PM from Shell and Core
Herbert Smith
Employed by the London office of Herbert Smith, Sunbury Heights is offering a full Project Management service for the relocation of their Moscow office. Services include the tender and employment of an Architect, M&E consultant, IT services, General Contractor and the management of 300m2 of sublease space.
UMC Kiev
Reconstruction of the industrial building into UMC New Technical Centre of Mobile Communication, 13500m2.
Chairing of Project Working Group, Design Documentation Management, Coordination of Permitting, Budget Control & Reporting, Appointment of Contractors, Procurement Management, Project Risk Management, Master Scheduling, Quality Assurance, Project Information Management, On-site Oversight, Coordination of Commissioning Activities.
UMC Donetsk
Reconstruction of the industrial facility building into the UMC Regional Centre of Mobile Communication (East Region), 1050m2.
Management of Architectural& Engineering Design, Coordination of Contractors, Procurement Management, Project Time Management,
Quality Control, On-site Supervision, Management of Uncertainties, Risk Allocation, Information Management and Reporting.
Canon
Sunbury Heights Construction Management was responsible for the complete design and construction of the new headquarters for Canon
in Moscow. We also managed this project and provided all cost control services.